WCAX Covers Installation of Northwind 100 at Heritage Aviation

The South Burlington TV station WCAX was on site with Alteris Renewables at Heritage Aviation’s General Aviation Facility as the nacelle and blades for their newly installed Northwind 100 turbine were put in to place. Alteris Renewables has already installed a solar electric and solar hot water system on the same facility. Heritage Aviation will be the first general aviation facility in the U.S. boasting this complete renewable energy solution. Check out the report for more details and live video of the blades being raised.

This entry was posted in News, Solar, Wind. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.