Press Roundup: Phoenix Press Turbine Underway!

Alteris workers install Phoenix Press turbine rotor

Alteris workers install Phoenix Press turbine rotor

Phoenix Press in New Haven, CT is the host site of Connecticut’s first commercial wind turbine which has been installed by Alteris Renewables. The turbine can be seen clearly from I-95′s Q Bridge (Quinnipiac Bridge)- the newest addition to New Haven’s skyline and a positive sign of the green economy at work!

Check out the Phoenix Press Wind Turbine Construction Photos by the New Haven Independent. If you’ve ever wanted an up-close look at what putting up a wind turbine looks like, this will get you close without the hardhat.

Follow along as the New Haven Independent photographs the raising of the rotor.

Read their original coverage of the groundbreaking ceremony also with wonderful photos of the event!

Check out the Hartford Courant’s report of the turbine raising, with dramatic photograph of the size and scale of the rotor before it was installed.

updated 2/18
This entry was posted in News, Solar, Wind. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.